000 | 00913nam a2200241u 4500 | ||
---|---|---|---|
001 | 01043161 | ||
003 | PWmBRO | ||
005 | 20240602103514.0 | ||
008 | 931118s1971 sa a b 10000 eng | ||
010 | _a93044182 | ||
090 | 0 | _b622.31/S989p | |
111 | 2 | 0 |
_aSymposium on the Theoretical Background to the Planning of Open Pit Mines with Special Reference to Slope Stability, _cJohannesburg, _d1970. |
245 | 1 | 0 |
_aPlanning open pit mines : _bproceedings ... / _cedited by P. W. J. van Rensburg. |
260 | 0 |
_aCape Town : _bBalkema (A.A.), for the South African Institute of Mining and Metallurgy, _c[1971] |
|
300 |
_axvi, 388 p. : _bill. |
||
500 | _aAt head of title. Open pit mining symposium 1970. | ||
650 | 0 | _aStrip mining. | |
650 | 0 | _aSlopes (Soil mechanics). | |
700 | 1 | 0 | _aVan Rensburg, P. W. J. |
710 | 2 | 0 | _aSouth African Institute of Mining and Metallurgy. |
942 | _2ddc | ||
994 | 0 | 1 | _a096317 |
999 |
_c76759 _d76759 |