000 | 00750nam a2200217u 4500 | ||
---|---|---|---|
001 | 00611719 | ||
003 | PWmBRO | ||
005 | 20240602103051.0 | ||
008 | 06 86 | ||
090 |
_aVF _b692.8/G646 |
||
100 | 1 | 0 | _aGoodacre, Peter E. |
245 | 1 | 0 |
_aDelays and disruptions in construction : _bascertaining the cost : _ba case study in assessing a contractor's claim / _cby P. Goodacre. |
260 | 0 | 0 |
_aAscot, Berks. : _bInstitute of Building, _c1979. |
300 | 0 | 0 |
_a29 p. : _bill. |
440 | 0 | 0 |
_aStudies in contractual claims ; _v6. |
650 | 0 | 0 |
_aBuilding _xEstimates _xCase studies. |
650 | 0 | 0 |
_aBuilding _xContracts and specifications _xCase studies. |
710 | 2 | 0 | _aInstitute of Building. |
942 |
_2ddc _01 |
||
994 | 0 | 0 | _aT1001 004 814 |
999 |
_c69707 _d69707 |