000 | 00867nam a2200229u 4500 | ||
---|---|---|---|
001 | 00677256 | ||
003 | PWmBRO | ||
005 | 20240602103019.0 | ||
008 | s1980 th ab d0001 engbt | ||
090 | 0 | 0 |
_aPR _b363.5/09953/T629u |
100 | 1 | 0 | _aTobiraon, Theodore Varpiam |
245 | 1 | 0 |
_aUrban settlement improvement and extension in Papua New Guinea: _ban evaluation case study of Horse Camp settlement, Port Moresby/ _cby Theodore Varpiam Tobiraon |
260 | 0 | 0 |
_aBangkok: _bAsian Institute of Technology, _c1980 |
300 | 0 | 0 |
_aviii, 78 leaves: _bill., maps |
502 | 0 | 0 | _aThesis (M.Sc.) -- Asian Institute of Technology |
650 | 0 | 0 |
_a�quatter settlements _zPapua New Guinea |
650 | 0 | 0 |
_aHousing _zPapua New Guinea |
651 | 0 | 0 |
_aHorse Camp (Papua New Guinea) _xSocial conditions |
710 | 2 | 0 | _aAsian Institute of Technology |
942 | _2ddc | ||
994 | 0 | 1 | _aT1001 047 562 |
999 |
_c68851 _d68851 |