000 00799nam a2200205 4500
001 00474487
003 PWmBRO
005 20240602102806.0
008 950524s1993 dcu f 10 10 eng
100 1 0 _aBhatt, Suresh K.
245 1 0 _aCost-benefit analysis of computer-assisted mining through production and cost modeling :
_ban update of IC 9281 /
_cby Suresh K. Bhatt.
260 0 _a[Washington, D.C.] :
_bUnited States Dept. of the Interior, Bureau of Mines,
_c1993.
300 _a40 p.
490 1 _aInformation circular ;
_v9367.
650 0 _aMining engineering
_xAutomation
_xCost effectiveness.
650 0 _aMining engineering
_xCost effectiveness.
710 2 0 _aUnited States.
_bBureau of Mines.
830 0 _aInformation circular (United Stated. Bureau of Mines) ;
_v9367.
942 _2ddc
999 _c65100
_d65100