000 00904nam a2200265u 4500
001 00975303
003 PWmBRO
005 20240602102422.0
008 920413s1990 enk 00010 eng
010 _a91036046
020 _a0906600928
090 0 _aVF
_b692.8/G646d/1990
100 1 0 _aGoodacre, Peter E.
245 1 0 _aDelays and disruptions in construction :
_bascertaining the cost :
_ba case study in assessing a contractor's claim /
_cby P.E. Goodacre and A.A. Hunter.
250 _a2nd ed.
260 0 _aBerkshire, England :
_bThe Chartered Institute of Building,
_c1990.
300 _av, 24 p.
440 0 _aStudies in contractual claims ;
_v6
650 0 _aConstruction contracts
_zGreat Britain.
650 0 _aBuildings
_xSpecifications
_zGreat Britain.
700 1 0 _aHunter, A.A.
710 2 0 _aChartered Institute of Building (Great Britain).
942 _2ddc
994 0 1 _a083950
999 _c58897
_d58897