000 | 00784nam a2200241u 4500 | ||
---|---|---|---|
001 | 00701904 | ||
003 | PWmBRO | ||
005 | 20240602101214.0 | ||
008 | 860501s1986 enka 00100 eng | ||
020 |
_a0070849323 : _c 17.00 |
||
050 | 0 |
_aT56 _b.I45 1986 |
|
082 | 0 | _a658.5�19 | |
090 | 0 | _b658.5/I42 | |
245 | 0 | 0 |
_aIndustrial engineering : _btechniques for improving operations / _cedited by Vas Prabhu and Malcolm Baker. |
260 | 0 |
_aLondon : _bMcGraw-Hill,on behalf of the Institute of Production Control, _cc1986. |
|
300 |
_ax, 171 p. : _bill. |
||
650 | 0 | _aIndustrial engineering. | |
700 | 1 | 0 | _aPrabhu, Vas. |
700 | 1 | 0 | _aBaker, Malcolm. |
710 | 2 | 0 | _aInstitute of Production Control (Stratford-upon-Avon, Warwickshire) |
942 | _2ddc | ||
994 | 0 | 1 | _aT1001 055 158 |
999 |
_c38512 _d38512 |