000 00815nam a2200241u 4500
001 00734144
003 PWmBRO
005 20240602100519.0
008 s1981 pp d0001 engbt
090 0 0 _aPR
_b690.06/81/P187c
100 1 0 _aPanau, Lukas.
245 1 0 _aCost control systems from the builders point of view /
_cLukas Panau.
260 0 0 _a[Lae]:
_bPapua New Guinea University of Technology, Dept. of Architecture and Building,
_c1981.
300 0 0 _a38 leaves.
490 0 0 _aAdvanced studies report.
610 2 0 _aLae Post Office Project.
650 0 0 _aBuilding
_xEstimates
_zPapua New Guinea.
650 0 0 _aCost control.
650 0 0 _aBuilding
_xEstimates.
710 2 0 _aPapua New Guinea University of Technology.
_bDept. of Architecture and Building.
942 _2ddc
994 0 1 _aT1001 037 549
999 _c26885
_d26885