Recharge studies in the Western Murray Basin. 3. Results of drilling programs at Euston and Balranald / by P. G. Cook, A. N. Holub and G. R. Walker.
Material type: TextSeries: Technical memorandum ; 89/1 | Technical memorandum (Institute of Natural Resources and Environment. Division of Water Resources) ; 89/1.Publication details: Canberra : CSIRO, Institute of Natural Resources and Environment, Division of Water Resources, 1989.Description: 1 v. : ill., mapISBN:- 0643048774 (paper)
Item type | Current library | Collection | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|
PNG Vertical Files | Matheson Library Vertical File | PNG Vertical Files | 631.41099448 C771r (Browse shelf(Opens below)) | Available | 070457 |
Browsing Matheson Library shelves, Shelving location: Vertical File, Collection: PNG Vertical Files Close shelf browser (Hides shelf browser)
This report presents the results of drilling programs carried out between August and September 1988 at field sites near Euston and Balranald, western New South Wales. The aim of the project was to determine whether clearing of native mallee (Eucalyptus spp.) vegetation in the region is likely to lead to significant groundwater salinity problems. The holes are located beneath mallee, and on land which was cleared 50 years ago, and has since been used for pasture and crops under a dryland farming regime. Samples were analysed for water content, chloride and matric suction.
There are no comments on this title.