Matheson Library
Empowering Knowledge, Inspiring Discovery

The construction, installation and operation of an improved pit-kiln for charcoal production / A.R.Paddon.

By: Contributor(s): Material type: TextTextPublication details: London : Royal Tropical Institute, 1986.Description: 20p. : illSubject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)