Matheson Library
Empowering Knowledge, Inspiring Discovery

Delays and disruptions in construction : ascertaining the cost : a case study in assessing a contractor's claim / by P. Goodacre.

By: Contributor(s): Material type: TextTextSeries: Studies in contractual claims ; 6.Publication details: Ascot, Berks. : Institute of Building, 1979.Description: 29 p. : illSubject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Vertical File Vertical File Matheson Library Vertical File Vertical Files 692.8 G646 (Browse shelf(Opens below)) Available 115091

There are no comments on this title.

to post a comment.